Bathroom Remodeling | Design-Build Costs | Neil Kelly
NEW WORKSHOP: Plan Your Remodel: A Free Webinar with Expert Guidance SIGN UP NOW

A Bathroom Remodel That Won't Leave You All Washed Up.

Bathroom remodels usually start with a breaking point, like a shower that's too cramped or countertop chaos caused by a lack of storage. After 80 years of remodeling in homes like yours, we can give you real numbers and a real timeline, not a vague range and a shrug.

Years in business 80
Projects completed 30K+
2,200+ Verified Reviews 4.6
Price contracts Fixed
Refresh-LEVEL bathrooms From $25K

How Much Do You Want to Change?

Most Neil Kelly bathroom remodels fall into one of three scope levels. You don't need to know which one you need yet — but understanding the differences will help you ask better questions and set a realistic budget.

Refresh

Refresh

New Finishes, Same Bones.

$25k-95kBudget Range
2-5 MonthsTimeline

Cabinet refacing, new countertops, hardware, paint, and lighting. No layout changes, no structural work. Best for: when the layout already works and the existing cabinets are still in solid condition.

Replace

Replace

Same Footprint, Brand-New Bathroom.

$45k–$158kBudget Range
4–6 MonthsTimeline

New cabinets, tub, tile, and countertops while keeping the existing layout intact. Includes light plumping and electrical updates. Best for: When the current cabinets are worn out and you want a completely fresh bathroom without changing the layout.

Reimagine

Reimagine

Walls Move. Layouts Change.

115k–$205k+Budget Range
6-9 MonthsTimeline

A fully redesigned bathroom layout that may involve moving walls, relocating plumbing or electrical, and rebuilding the space from the ground up. Best for: When the bathroom no longer works for your family, grooming habits, or overall flow of the home.

Six Phases. No Headaches.

Every Neil Kelly bathroom project moves through six phases. The process is built so you know what's happening, what's coming next, and what you need to decide — before you have to decide it.

  1. 01

    In-Home Design Consultation

    A Neil Kelly designer will come to your home for free 60-to-90-minute discussion. We'll talk through your goals, your constraints, and what's actually possible in your space. No commitment required — and no need to tidy up first.

  2. 02

    Schematic Design

    Floor plan options, materials direction, scope confirmation. You'll see alternatives, have your questions answered, and further shape the direction before any detailed drawings are made.

  3. 03

    Design Development

    Full plans, full specs, every material selected. This is where your concept becomes a clear direction and pricing gets finalized.

  4. 04

    Fixed-Price Contract

    The number you see is the number you pay. Permits filed, materials ordered, schedule set. No surprises when construction starts.

  5. 05

    Construction

    Construction by Neil Kelly's in-house craftspeople. A dedicated project manager handles the trades, the schedule, and the daily details. Weekly updates, no guesswork.

  6. 06

    Punch List + Warranty

    Final walkthrough. Anything that's not right gets fixed before you sign off. Five-year warranty coverage starts on completion.

How Much Will it Cost?

These four things will have the biggest impact on what your bathroom remodel costs. Bathrooms reward early decisions, and knowing the drivers up front is the fastest way to avoid sticker shock later.

Scope of Structural Work

Layout changes drive cost more than anything else in a bathroom remodel. Moving a toilet, shower, or vanity means relocating plumbing, and that work adds up quickly. The closer you stay to your existing floor plan, the more budget you have for finishes and fixtures.

Materials & Finishes

Bathrooms are finish-intensive spaces. Tile alone can range from modest to significant depending on material, format, and how much surface it covers. A designer can help you understand where to invest and where to pull back without compromising the result.

Your Home's Existing Conditions

Bathrooms are where existing conditions show up most often. Moisture damage, outdated plumbing, and inadequate ventilation are common finds once walls come down. We evaluate carefully before pricing so that what's behind your walls doesn't become a budget surprise.

Your Location

Taxes and labor costs vary across Bend, Eugene, Portland, and Seattle, as do permitting fees and inspection requirements.

What We Run Into. What We Do About It.

Some things are specific to remodeling in the Pacific Northwest. Here's what we see regularly, and how we handle it.

Permit Timelines

Portland and Seattle permit backlogs can add weeks to any remodeling schedule. We file early, follow up consistently, and put a realistic timeline in your contract from the start.

Weather and Moisture

Eight decades of remodeling in the PNW means we know what moisture does to a home — and where to look for it. We build with proper venting, moisture-rated materials, and detailing that holds up to local conditions.

Aging Home Conditions

A lot of the homes we work in are 50–100 years old. What's behind the walls is rarely straightforward. We plan for it, and when something comes up we tell you quickly and clearly.

Structural Surprises

Load-bearing walls and hidden structural elements don't always match the original drawings. Our designers and project managers look for risk early — before it becomes a change order.

Knob and tube electrical wiring discovered during deconstruction of a bathroom remodel

Bathroom Remodel Questions, Answered.

How much does a bathroom remodel cost?

The cost of a bathroom remodel with Neil Kelly depends on the size of the bathroom, the changes being made, materials chosen, your home type and condition, and your city. Given those variables, bathroom remodels with Neil Kelly cost anywhere from $25,000 up to and beyond $245,000. The best way to learn specifics is to contact one of our designers.

How long does a bathroom remodel take?

Timeline depends on the size and scope of the space. A powder room or guest bath with focused updates might wrap up in 2-4 months, while a large primary bath with layout changes and custom work can run 6-9 months or more.

Do I need a permit for a bathroom remodel?

Many bathroom remodels require permits, particularly when updating plumbing, electrical, structural changes, or moving fixtures. Cosmetic updates like painting or replacing faucets do not need a permit. When you work with Neil Kelly, permits are handled by your dedicated project manager.

Should I replace or refinish my bathtub and shower?

Refinishing or resurfacing can be a budget-friendly solution if the space is structurally sound but the tub is slightly stained, chipped, or the tile needs updating. Replacement should be considered if there are cracks, leaks, mold, or other signs of water damage.

What bathroom layout works best?

The best layout depends on the size of your bathroom, your needs, and your budget. Popular options include: One-wall plumbing (sink, toilet, and tub/shower fixtures all along one side), Three-Quarter Bath (sink, toilet, and shower — no tub, great for guests), Primary Bath (double vanities, separate tub and shower, private toilet for larger spaces), and Jack and Jill (shared between two bedrooms with two sinks and shared toilet/shower).

How much lighting will my bathroom need?

Consider the size of the space, vanity dimensions, and existing electrical layout. A good rule of thumb: overhead or ambient lighting for general use, task lighting around mirrors and vanities for grooming, and optional accent lighting to create a serene atmosphere.

How can I make my bathroom more accessible?

Neil Kelly focuses on safety, ease of movement, and overall comfort when designing accessible bathrooms. Key features include: grab bars, non-slip surfaces, minimizing the threshold into showers, ensuring proper lighting, and adding shower chairs or benches. Neil Kelly designers have extensive experience creating accessible bathroom spaces.

Do I need a plumber for a bathroom remodel?

In the Pacific Northwest, a licensed plumber is required for any bathroom remodel that involves altering, relocating, or adding plumbing fixtures and water or drainage lines. A permit is almost always necessary for major changes. Neil Kelly works only with licensed and insured contractors.

What are the most cost-effective bathroom upgrades?

The most cost-effective bathroom upgrades include: painting or refinishing cabinets, updating plumbing fixtures such as faucets and showerheads, refreshing caulk and grout to make tile and tubs look clean and new, and replacing old light fixtures to brighten the space.

How do I prepare my home for a bathroom remodel?

Neil Kelly recommends: clearing out cabinets, countertops, and shower niches; ensuring you have an alternative bathroom solution prepared; and ensuring that children and pets will not be able to access the construction zone.

What are the scope levels for a bathroom remodel (Refresh/Replace/Reimagine)?

Bathroom remodels generally fall into one of three scope levels: Refresh (cosmetic updates within existing layout), Replace (all new materials and fixtures within exisitng layout), and Reimagine (regonfigure layout including plumbing and electrical, then installing all new materials and fixtures).

Can I add a bathroom where there was not one before?

Usually, yes. Adding a new bathroom is possible but requires careful planning around plumbing, venting, electrical, and structural considerations. Neil Kelly handles all of this as part of the design-build process.

What is the difference between a primary bath, guest bath, and powder room remodel?

Primary baths are the most complex and costly (larger square footage, walk-in showers, soaking tubs, dual vanities). Powder rooms (half baths — no shower or tub) are the smallest scope and most budget-friendly. Guest/Hall baths will be somewhere in the middle.

Working with Neil Kelly in Your Area.

Ready to talk about your specific project? Connect with the Neil Kelly team in your area. Each location has its own designers, project managers, and design center.

  • Oregon Portland Neil Kelly's flagship bathroom remodeling team, serving Portland since 1947. Original design center on Alberta Street. Get Started in Portland
  • Washington Seattle Award-winning bathroom remodelers serving greater Seattle and King County. Get Started in Seattle
  • Oregon Eugene Full-service bathroom remodeling for Eugene, Springfield, and the South Willamette Valley. Get Started in Eugene
  • Oregon Bend Central Oregon's kitchen remodeling specialists. Mountain and high-desert homes.
    Get Started in Bend

Let's Talk About Your Bathroom.

Ready to see what your bathroom could be? Start with a conversation. A Neil Kelly designer will come to your home, learn what you're working with, and give you a clear picture of what's possible.